Rencana gambar

Dhaptar bahan
|
Ora. |
Jeneng Bahan |
Spesifikasi |
Unit |
Jumlahe |
Bahan |
Cathetan |
|
1 |
Disc |
φ300 |
PCS |
2126 |
Epdm |
|
|
2 |
Konektor Clamp |
DN50-20-20 |
PCS |
2126 |
Abs |
|
|
3 |
Pipa utama |
Dn80 |
meter |
573.1 |
Upvc |
6m (pipa vertikal) * 28 PC 5.4m * 28 PC 4.8m * 28 PC 4.7m * 15 PC 4. 1 m * 4 PC 3.5m * 8 PC 2.9m * 1 PC 1.7m * 1 PC |
|
4 |
Pipa utama |
DN65 |
meter |
233.6 |
Upvc |
6m (pipa vertikal) * 16 PC 4.8m * 16 PC 4.1m * 12 PC 2.9m * 4 PC |
|
5 |
Pipa cabang |
DN50 |
meter |
1275.6 |
Upvc |
5.4m * 102 PC 4.8m * 151 PC |
|
6 |
Tee sing padha |
Dn80 |
PCS |
28 |
Upvc |
|
|
7 |
Tee sing padha |
DN65 |
PCS |
16 |
Upvc |
|
|
8 |
Flange |
Dn80 |
PCS |
28 |
Upvc |
|
|
9 |
Flange |
DN65 |
PCS |
16 |
Upvc |
|
|
10 |
Reducer tee |
Dn80-50 |
PCS |
204 |
Upvc |
|
|
11 |
Reducer tee |
DN65-50 |
PCS |
104 |
Upvc |
|
|
12 |
Sikut |
Dn80 |
PCS |
114 |
Upvc |
|
|
13 |
Sikut |
DN65 |
PCS |
64 |
Upvc |
|
|
14 |
Lurus Konektor |
DN50 |
PCS |
102 |
Upvc |
|
|
15 |
Banyu udara - Saluran |
DN20 |
Setel |
22 |
Upvc |
|
|
16 |
Pipo |
DN20 |
meter |
176 |
Upvc |
Kanggo udhara - banyu gamber Sistem |
|
17 |
Sikut |
DN20 |
PCS |
110 |
Upvc |
|
|
18 |
Katup bal |
DN20 |
PCS |
22 |
Upvc |
|
|
19 |
Utas Tunggal Adaptor |
DN20 |
PCS |
22 |
Upvc |
|
|
20 |
Klip Saddle |
DN20 |
Setel |
110 |
304 |
|
|
21 |
Ekspansi bolt |
M6*70 |
Setel |
220 |
304 |
|
|
22 |
Konektor Clamp |
Dn80-20 |
PCS |
14 |
Abs |
|
|
23 |
Konektor Clamp |
DN65-20 |
PCS |
8 |
Abs |
|
|
24 |
Bolongan siji Kurungan |
DN50 |
PCS |
360 |
Abs |
|
|
25 |
Luwes Kurungan |
Dn80 |
Setel |
240 |
304 |
|
|
26 |
Luwes Kurungan |
DN65 |
Setel |
108 |
304 |
|
|
27 |
Luwes Kurungan |
DN50 |
Setel |
401 |
304 |
|
|
28 |
Pipa vertikal Kurungan |
Dn80 |
Setel |
56 |
304 |
|
|
29 |
Pipa vertikal Kurungan |
DN65 |
Setel |
32 |
304 |
|
|
30 |
Ekspansi bolt |
M8*80 |
Setel |
360 |
304 |
|
|
31 |
Bolt Flange |
M16*80 |
Setel |
352 |
304 |
|
|
32 |
Gasket |
Dn80 |
PCS |
28 |
Karet |
|
|
33 |
Gasket |
DN65 |
PCS |
16 |
Karet |
|
|
34 |
Lem |
botol |
22 |
Kabar Instalasi kanggo disffuser disk
Ringkesan 3.1
Asuration minangka salah sawijining kerajinan umum ing solusi perawatan limbah. Sistem penurunan kalebu jumlah gedhe kanggo penyebaran aerasi. Penyebaran kasebut digawe saka bagean kayata karet lan plastik, lan gampang dirusak. Mula, instalasi sistem kerusetan mbutuhake kahanan sing cocog, utawa operasi sakteruse bisa uga kena pengaruh.
Ing tanduran perawatan limbah, sistem keri asring dadi bagean pungkasan sing bakal diinstal. Sawise dipasang ing papan, tanduran perawatan limbah bisa miwiti mlaku.
3.2 kahanan instalasi
Kahanan ing ngisor iki dibutuhake sajrone instalasi sistem lelaran:
(1) babagan syarat tank aerasi:
- Pambangunan proyek tank aerobik kudu rampung.
- Konkrit kudu garing supaya cukup kanggo ndandani bolts ekspansi.
- Ing ngisor tangki aerasi kudu di resiki kanthi tliti, tanpa banyu utawa sundri.
(2) Aliran lan dalan mlaku ing permukaan tank kudu diinstal, lan langkah-langkah safety kudu ana ing papan.
(3) Blowers lan udhara kudu diinstal (kabeh pipa baja kudu diinstal kanthi lengkap, lan ora bakal diinstal bebarengan karo sistem penasaman ngisor. Sampeyan kudu siap kanggo sumber udara.
(4) Kahanan pasokan banyu kudu ditemoni kanthi lengkap, lan fasilitas pasokan banyu kudu diatur luwih dhisik.
Isih banyu menyang tank aerobik kanggo komisi, priksa apa pipa bocor, lan mesthekake level banyu sing diffuser lan keseimbangan aerasi.
Sistem penerapan kudu dicelupake ing banyu sawise instalasi.
Wiwit komponen karet lan plastik kalebu bahan molekul {{{}} bahan molekul, dheweke bisa dadi tuwa lan ngrusak nalika katon srengenge. Yen kahanan sumber banyu ora ketemu, instalasi kudu ditundha nganti kahanan sumber banyu puas.
Mung yen kabeh kahanan instalasi iki wis rampung bisa uga sistem aerunasi dipasang. Yen ora, bisa mengaruhi efek lelara sabanjure. Sembarang masalah kualitas karo sistem kerusetan sing disebabake dening kahanan instalasi UNMT ora dadi tanggung jawab saka supplier utawa installer.
3.3 prosedur instalasi
(1) Deleng gambar konstras instalasi lan verifikasi yen situs bisa ngrampungake kahanan instalasi.
(2) Priksa manawa dimensi kolam situs sing cocog karo gambar konstruksi.
(3) Mark Garis miturut kahanan situs lan gambar.
(4) Boluk ekspansi ing sadawane garis lan nginstal kurung pipa sing bisa luwes.
(5) Pipa Cut miturut dimensi sing ditemtokake ing gambar.
(6) Posisi pipa intake udara udara lan gam sing cocog karo papat {{1} kanthi cara utawa nyuda peralatan tee (cathetan: njamin alignment horisontal lan vertikal).
(7) tandha tandha lan bolongan pengeboran ing pipa cabang miturut posisi diffuser ing gambar. Ukuran bolongan umume 6-8mm, gumantung karo model diffuser spesifik (mesthekake ngresiki lebu sawise ngebur; ora ana lebu yen ana ing piping).
(8) Selehake pipa cabang ing kurung pipa sing bisa luwes lan gunakake menyang pipa intake udara tengah (cathetan: mesthekake bolongan sing dilatih ing pucuk cabang ing ndhuwur).
(9) Sambungan konektor pipa lan sikut driji kanggo pipa cabang sing mbukak (cathetan: njamin alignment horisontal lan vertikal).
(10) Nyetel tingkat sakabehe pipo kanthi nggunakake kurung pipa sing bisa luwes.
(11) Nyuda kurung pipa sing bisa luwes nganggo hubungan nilon (metode: Klip bolongan - Sisih krenjang, banjur pasang rod ing salam-bakar, banjur pencet alon-alon kanggo ngamanake).
(12) Gug konektor diffuser menyang posisi sing dilatih ing pipa cabang (cathetan: mesthekake konektor diffuser kanthi vertikal).
(13) Instal diffuser.
(14) Sawise diffuser lan piping dipasang, isi tank nganggo banyu nganti 100mm ing ndhuwur bocor udara ing sambungan pipa ing sambungan pipa ing sambungan pipa. Yen ana bocor, tandhani lan ndandani kanthi cepet. Sawise kabeh wis diuji lan mumpuni, sistem kasebut bisa diobong kanthi resmi.
3,4 Dianggo lan Jaran
(1) Produk iki mung cocog kanggo kahanan ing ngisor iki:
(a.) Suhu banyu: 10-50 gelar
(b.) Kualitas banyu: kualitas banyu sing mlebu kudu nyukupi kualitas banyu sing ditemtokake ing gambar kontrak.
(c.) Air volume: kudu nyukupi syarat desain.
(2) Sawise instalasi lan komisi, yen operasi banyu ora langsung diwiwiti, tangki aerasi kudu diisi paling ora 1,5 meter banyu kanggo perlindungan. Duwe banyu ing tank bisa nyegah karusakan ing sistem kerusahan saka srengenge, pembekuan, lan kahanan cuaca sing ekstrem liyane, uga nglindhungi obyek sing tiba ngrusak sistem kasebut.
CATETAN: Amarga bedane iklim regional, tingkat banyu ing tank aerasi ora kurang saka 1 meter wiwit wulan Juni nganti September nganti wulan Januari nganti Mei lan wulan Desember nganti Desember.
(3) Ganti Distribusi Disc amarga ing kahanan lan kahanan ing ngisor iki ora dijamin dening garansi:
(a.) Kerusakan sistem kerusetan sing disebabake dening konstruksi sabanjure, kayata obyek sing ambruk ngrusak peralatan utawa ngisinake slag sing ngobong sistem kasebut, sawise instalasi sistem lelara.
(b.) Gagal ngisi tank kanthi banyu kanthi cepet sawise instalasi, nyebabake penurunan sistem amarga cahya srengenge utawa sistem retak amarga suhu sithik.
(c.) Operasi ing limbah ing limbah kanthi kualitas banyu sing ora stabil, kayata asam sing kuwat, alkali kuwat, viskositas, utawa pirang-pirang minyak clogging utawa membran pori.
(d.) Kualitas udara sing kurang ing hawa aerasi, kanthi kontaminasi minyak saka blower mlebu pipa, nyebabake karusakan ing membran sistem lelara.
(e.) Gagal ngetutake tata cara operasi sajrone operasi, ora cukup aliran udara sing ora kakehan nyebabake karusakan ing sistem kerusetan; Sludge netepi membran sawise mungkasi udhara, kanthi pekerjaan, nyebabake kakehan membran lan pecah.
(f.) Kerusakan sing disebabake dening panggunaan, pangopènan, utawa panyimpenan sing ora bener, utawa kerusakan sing disebabake dening kekuwatan majeure utawa awake dhewe -}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}.
(g.) Yen komisi ora bisa ditindakake sajrone seminggu sawise instalasi, sistem ora dijamin dening garansi.
3,5 pancegahan:
(a.) Kanggo nyegah karusakan ing piranti kerusetan saka operasi liyane, kayata cemara lan konstruksi sipil kudu diinstal mung sawise kabeh fasilitas aerasi tangki aerasi wis rampung.
(b.) Yen klien njaluk kiriman lan nginstal dhisik, tanpa komisi langsung, biaya tambahan kanggo instalasi sekunder lan komisi, tunjangan, lan tunjangan mangan, bakal ditanggung dening klien.
(c.) Sawise kiriman menyang situs klien, klien tanggung jawab kanggo mlebu ing panrimo lan duwe kewajiban kanggo nglindhungi barang.
Foto proses instalasi lan video
4.1 Kedatangan ing situs proyek

4.2 Ringkesan Site Proyek



4.3 Kemajuan instalasi
4.3.1 Penempatan pipa aererasi miturut gambar konstruksi


4.3.2 Instal konektor clamp lan nindakake leveling leveling



4.3.3 pipa aerasi sing aman kanthi bolt ekspansi


4.3.4 Instal diffuser




4.3.5 KOMINIONING INLET




4.3.6 Panampa wis liwati, dilebokake